Project
Entrance area and the event loft Krah
Quantity
15m³
Construction time
August 2025
Product
thermotec BEPS-WD160N A2
Factsheet
thermotec pre-mixed Material in use
As part of this project, we were able to install the fill in the entrance area as well as in the loft using our thermotec pre-mixed material. Processing was carried out cleanly, efficiently and reliably with the support of the thermotec continuous mixer and the miniMIXMOBIL.To the Facebook post

General
In the Loft
In the loft on the first floor, the thermotec pre-mixed material was pumped using the miniMIXMOBIL and installed professionally.

Used products
Speziell für dieses Projekt
Sehen Sie, welche Produkte wir für dieses Projekt verwendet haben, um die fachgerechte Dämmung umzusetzen.