Project
Hotel Falkensteiner
Architect
Architektenbüro "archisphere",
Gesamtleitung Mag. Arch. Gabriel Kacerovsky
Place
Wallseerstraße 10, 4190 Bad Leonfelden
Total area
11.000 m²
Construction time
December 2017 - March 2018
Product
100m³ thermotec BEPS-WD 90N
550m² nanoestrich F8 ground and polished
Factsheet
Challenge
The hotel was equipped with cutting-edge technology. It was necessary for the levelling insulation layer to ensure the required strength with high installation thicknesses of up to 20 cm, despite the many lines in the floor structure.General
Construction process
thermotec BEPS-WD 100R was used. thermotec BEPS-WD 70N was applied in those areas where construction time had to be caught up on due to other tradespeople missing deadlines, so that the screed could be laid after 24 hours – despite outside temperatures dropping as low as -15°C.
Used products
Speziell für dieses Projekt
Sehen Sie, welche Produkte wir für dieses Projekt verwendet haben, um die fachgerechte Dämmung umzusetzen.