Project
Ifen Hotel Hirschegg
Architect
Alpstein GmbH, Immenstadt
Quantity
50m³
Product
pooltec Floor
Construction time
July 2021
Image rights
©Felder Metall GmbH
Factsheet
Pipelines and depressions were balanced out, while the insulation of the stainless-steel basin in the outdoor area also had to be of high quality in order to ensure constant heat retention in the pools. thermotec demonstrates all its strengths, and the quick drying times and simple, straightforward installation also impressed the pool builder.
General
Used products
Speziell für dieses Projekt
Sehen Sie, welche Produkte wir für dieses Projekt verwendet haben, um die fachgerechte Dämmung umzusetzen.