Student halls of residence in Frankfurt am Main

Levelling out multiple pipes of different thicknesses and significant unevenness in the raw ceiling.

More info

Project

Student halls of residence in Frankfurt

Architect

APB Architekten BDA, 20459 Hamburg

Screed layer

Fa. Sari, Hanau

Place

Frankfurt am Main, Hansaallee 141

Total area

12.000 m²

Constructin time

June - September 2014

Product

Approx. 800 m3 thermotec® BEPS-WD 100R

Factsheet

Challenge

Levelling out multiple pipes of different thicknesses and significant unevenness in the raw ceiling.

It would have been a good thing if the current residents of the student residence – above all aspiring civil engineers and architects – had been present during the installation of the floor construction. They would have experienced first-hand how thermotec® levelling fills can be used today to eliminate unevenness in the raw ceiling and laid pipelines in no time at all. thermotec® BEPS-WD 100R is an absolute all-rounder, especially when it comes to extreme unevenness – as is the case here in the project in Frankfurt.


General

Construction process

The thermotec®-Mixmobile and installation column work hand in hand, as the thermotec®-Mixmobile pumps consistent product quality exactly where the installer and leveller want it and this is achieved mixture by mixture. Once the extremely short drying time had elapsed, the 20 mm thick impact sound insulation panel could be installed, followed by a uniformly thick 50 mm screed at all points.

Planners, fitters and investors alike were all convinced by this high-quality floor substructure. It is hoped that this reliability will also accompany future construction projects.

Used products

No post was found with your current grid settings. You should verify if you have posts inside the current selected post type(s) and if the meta key filter is not too much restrictive.

More
References

References

IFEN HOTEL HIRSCHEGG

Outdoor stainless steel pool insulated with...

Mixit Dämmstoffe GmbH

The challenge in this project was to install...

Hotel Falkensteiner

It was necessary for the levelling insulation...

Polar bear facility „Franz-Josef-Land“, Zoo Schönbrunn

The red bear turns white. The requirement for...

FÖRDETERRASSEN | KIEL-HOLTENAU

Despite the low height of the floor...

St. Martins Spa

Pool insulation for Indoor and Outdoor Pools...

Single-Family-House Linz Land

From floor insulation to flat roof slope...

Pool Linz Land

An outdoor pool that is in use all year...

Vega observatory Salzburg

A visible screed ground down to the grain in...

Consento

Full power was the name of the game at the...

Single-Family-House Grünbach

Challenge - an existing building in shell...

Marina Tower Vienna

Our installation team with the thermotec®...

Aqua Dome

Indoor and outdoor pools at Aqua Dome, the...

Public buildings

thermotec® ensures safety and you benefit from long-term cost savings, energy efficiency and sustainability through eligibility for subsidies.

Indoor & outdoor pools

Die thermally insulating pooltec® Premium backfilling and pooltec® Premium insulating floor slab of thermotec® slab extend the swimming season by months!

Commercial

Open-plan offices, car workshops, warehouses – our highly resilient thermotec® loose-fill insulation can handle heavy loads.

Residential

Regardless of whether it's a new build or refurbishment: our non-toxic thermotec® products ensure the feel-good factor and your health!

Areas of application

Anrufen